top of page
SSMMA

RFQ: Village of Robbins - Claire Boulevard Resurfacing Project

General: The Village of Robbins (Village) is accepting Qualifications from engineering firms that are prequalified by the Illinois Department of Transportation (IDOT) to provide Preliminary (Phase I), Design (Phase II), and Construction (Phase III) Engineering Services for the Claire Boulevard Resurfacing project.


Project Description: The Claire Boulevard Resurfacing project involves hot-mix asphalt surface removal and replacement with polymerized leveling binder and hot-mix asphalt surface course, spot curb and gutter removal and replacement, driveway, sidewalk, ADA detectable warnings removal and replacement, where necessary, and thermoplastic striping. The project limits are from Francisco Ave to Kedzie Avenue.


The project is being funded through a combination of Surface Transportation Program (STP) and Local funds and must adhere to all Village, State, and Federal requirements. The Village expects the Preliminary Engineering to start as soon as possible and is hopeful to make a spring 2024 IDOT letting. The Village is hoping to begin construction in late fall 2024. The construction budget for this project was estimated at $414,000.


Submission Deadline: 12:00pm December 20, 2023


Questions and Inquiries:

Gerald Stewart,Public Works

Village of Robbins

3327 W. 137th Street Robbins IL. 60472

Phone number: 708-470-9882


Download the complete RFP below.





Tags:

75 views0 comments

Comments


bottom of page